310 310s Stainless 35mm Square Steel Pipe Polished
Product Details:
Place of Origin: | China |
Brand Name: | Tisco Bao steel |
Certification: | SGS ISO MTC |
Model Number: | 310s |
Payment & Shipping Terms:
Minimum Order Quantity: | 2 tons |
---|---|
Price: | $4.11/KG |
Packaging Details: | Seaworthy wooden pallet or according to client's requirement |
Delivery Time: | 7-30 working day |
Payment Terms: | L/C, T/T, Western Union,, MoneyGram |
Supply Ability: | 1000 Tons per Month |
Detail Information |
|||
Grade: | 310s | Steel Grade: | 300 Series |
---|---|---|---|
Standard: | ASTM,JIS,AISI,DIN | Type: | Welded,Seamless |
Thickness: | 0.4-35mm | Technique: | Cold / Hot Rolled |
Shape: | Round.square.Rectangle | Finish: | Brush Polish,hairline,160grit,bright |
Highlight: | 35mm Square Steel Pipe,310 Square Steel Pipe,310s Square Steel Pipe |
Product Description
310 square steel pipe , 310s Stainless Steel polished Tube
1.Stainless Steel polished Tube Application
1). Heat exahanger tube for petrochemical,chemical and ocean development
2). Industrial furnace and heater tubes
3). for gas turbine and prochemical processing4).Condenser tubes,sulfuric and phosphoric acids tubes,API tubing
5). Construction and ornament
6). Acid production,waste incineration,FGD,paper processing industrial etc
2. Stainless Steel polished Tube Chemical composition
Chemical composition | C | Si | Mn | P | S | Ni | Cr | Mo | |
≤0.03 | ≤1.00 | ≤2.00 | ≤0.045 | ≤0.030 | 10.0-14.0 | 16.00~18.00 | 2.00~3.0 | ||
Physical Characteristics | Hardness | Tensile strength(бb)(Mpa) | Yield Strengthσ0.2 (MPa) | ||||||
≤187 | ≥520 | ≥205 |
3. Stainless Steel polished Tube Classification
Stainless steel tube can be divided into round tube and profiled tube according to the shape of cross
section.The special-shaped tube has rectangular tube, diamond tube, elliptic tube, hexagon tube, octagon
tube and various section asymmetrical tube and so on.
4.Stainless Steel polished Tube Product picture
5. Packing
Packing Concrete Steps:
1. pipes covered with wooden plate for protection in transportation.
2. All pipes will be loaded in strong wooden packages.
3. Every cartons loaded with good shoring and strengthening.
4. Take container loading pictures and seal the container.
6. More information
MOQ | 1 TON |
Price term | FOB/CIF /CFR |
Payment term | T/T,L/C(30% deposit byT/T and 70% payment before delivery) |
Delivery time | 5-10 days,Based on stock and order quantity |